What does a dry reading mean in a Hammond wall?
A dry reading is a number on the meter that matches the dry standard for that material. It is not a feeling, and it is not the same as the surface looking dry.
Each material has its own dry goal. Wood framing is measured against a moisture content figure, plaster and drywall against their own scale, and masonry against a reference reading taken from an unaffected wall in the same house. The technician records the readings with a location and a date, and the same points are measured on every check so the trend is visible.
The reason this matters is that a wall can look dry and still hold water at the sill, and a floor can feel dry while the subfloor under it is still wet. Those hidden readings are what cause the mold and the rot that show up months later, so the plan treats them as the job rather than as a formality.
Why does drying take longer in older Hammond houses?
Older construction holds moisture in plaster, lath, plank subfloors and solid masonry, and each of those releases it at its own pace. The drying plan is built around that.
A plaster wall over wood lath has a thick coat that takes in water and holds it against the lath. The air has to reach the back of that coat to move the moisture, which is why a small number of inspection holes are sometimes needed. A plank subfloor has gaps between the boards, and water runs along them until it reaches a joist bay where it stays. Neither of those problems shows on the surface.
Houses built before the modern wall assemblies in this area also have basements where the wall, the sill and the floor were built with different materials, each with its own moisture behavior. The drying plan takes those differences into account, and the readings show when each one has caught up with the rest.
What happens to the equipment, and who pays for the electricity?
The equipment runs on the building's power, and its draw is noted on the job record. The schedule of checks, the equipment list and the reasons for each change are written down and handed to the owner.
Air movers and dehumidifiers are large and loud, and they draw a steady load on a circuit that may already be carrying a freezer, a furnace and a sump. The technician checks the circuits before the equipment is set, and the owner is told which outlets are in use. If a circuit trips or a cord is warm, the equipment is moved rather than left running.
The record of equipment placement is part of the drying file. It shows which rooms were dried, when the readings were taken and when the equipment came out, and it is the document an adjuster asks for when reconciling a claim.
When is drying finished, and what is left to repair?
Drying is finished when every material in the affected area has reached its dry goal on two consecutive checks. Repair of the finish, the framing and the mechanical parts is a separate stage with its own scope.
Once the readings are dry, the equipment is removed and the room is checked one more time. Any finish that was damaged and cannot be dried, such as a swollen particle board base or a bowed subfloor section, is listed for removal. Repairs to the walls, floors and ceilings are quoted after the drying record is complete, so the scope reflects what the readings found and not what was guessed at the start.
A drying file is what turns a restoration job into something a homeowner can use later. It holds the readings, the photographs and the list of what was kept and what was removed, and it should be kept with the rest of the paperwork for the house.