Why does a wet floor look fine for days?
Wood and adhesive dry slowly under a finish, and the surface can feel dry while the moisture is still in the subfloor. Cupping and lifting often appear several days after the water has gone.
Hardwood takes in water from below and the top of the board dries first, so the board curls up at the edges where the moisture is highest. The change may take days to show, and it can look like a problem that started after the work was finished. The readings taken in the first few days are the best record of what happened.
Vinyl and laminate are less visible, but the adhesive and the underlayment hold water against the subfloor. A soft spot or a ridge at a seam is often the first sign, and the readings are taken at that spot before the finish is lifted.
Can hardwood be saved after water damage?
Hardwood can be saved if it flattens after drying and its boards are sound. Boards that stay cupped, split or swollen at the joints are replaced.
Strip oak in an older house is often thick enough to be sanded and refinished after it has dried. The boards are numbered as they come up, so that the same pattern can be reinstalled in the same place. Where a board is badly swollen, it is replaced with a board that matches the species and width as closely as possible.
The decision is made after the floor has dried to its goal. A floor that is sanded while still wet, or that is refinished over a damp subfloor, will fail again in the same place and the owner will bear the cost of the second repair.
Refinishing leaves the wood open to moisture for a while, so the finish is applied only after the readings have been dry for the full period in the plan. The choice between an oil and a film finish is made with the refinisher, since some finishes trap moisture if they are laid over a damp board.
How does a subfloor dry when the room is above a basement?
Air is moved across the subfloor from below, through the basement ceiling or a crawl space access, and from above where a finish has been lifted. The joists are read along their length.
The joists are the path of the water and the slowest part of the framing to dry. The equipment is placed under the subfloor where it can be reached, and the air is directed along each bay. The readings in the joists show whether the water has reached them and whether it is leaving at the rate the plan expects.
Basement ceilings that are finished with drywall or plaster are opened only where the readings stay high. Those openings are small and they are recorded, and they are closed once the framing beneath the subfloor has dried.
What should be checked before a new floor goes down?
The subfloor should read dry at every joist, the seams should be closed and the surface should be level. A new floor laid over a damp or uneven subfloor will show the same damage again.
A level check is part of the closing stage. Where the subfloor has swollen at the seams, the high points are sanded and the gaps are filled before the new finish is laid. Underlayment and a vapour barrier, where they are used, are chosen for the finish and the subfloor, and that choice is made with the installer.
The owner gets the drying record and the list of what was kept and what was replaced. That record matters for the insurer and for any future sale, because it shows the subfloor was read and dried before the finish went back down.